PROJECT- SIR JOHN LAING BUILDING
CLIENT- COVENTRY UNIVERSITY
OUR CLIENT WANTED TO REFURBISH THREE OLD TEACHING AREAS, TO GIVE THEM A FRESH MODERN LOOK.
WE INSTALLED NEW FLOORING, CEILING, WINDOW BLINDS AND FULL DECORATION.
WE ALSO UPGRADED THE LIGHTING AND INSTALLED NEW MOVABLE GLASS PARTITIONS. FINALLY A NEW AV SYSTEM WAS INSTALLED.
PROJECT: ENGINEERING & COMPUTING BUILDING
CLIENT: COVENTRY UNIVERSITY
OUR CLIENT WANTED TO TURN A LARGE OPEN PLAN SPACE INTO TWO SEPERATE TEACHING AREAS.WE INSTALLED 100M2 OF PARTITIONING TO CREATE THE SEPERATE AREAS INCLUDING CORRIDOR. FULL DECORATION, FLOORING AND ACOUSTIC WORKS.
Project: The Hub
Client: Coventry University
The client wanted to create 3 separate rooms inside an open plan office area.
Project: Meridian Court, Derby
Client: Capita plc
This small project involved the reconfiguration of the lighting plan on the 1st and 2nd floors as part of the overall dilapidation works.
Project: The Cycle Works
Client: Coventry University
The client wanted to create some extra storage, so we created an understairs storage cupboard.
Project: Bishops Gate
Client: Coventry University
This small project involved installing a petition wall and fire door to seperate to areas of the student accomadation building.
Project: Fort Dunlop Birmingham
Client: Capita plc
Working at the prestigious Fort Dunlop, the project consisted of dilapidation works to return the space to its original open plan design.
The works were completed on time and on budget.
Project- Mile Lane Coventry
Client- Coventry University
The project involved turning a large open floor plan into four seperate classrooms. This was created using stud and glazed partitions and new door sets.
Project- Jaguar Building Coventry
Client- Coventry University
This project involved installation of a steel framed fire door set to link two lecture rooms.
The opening was stitch drilled and lintels added and was completed in good time and under budget.
Project- Premiere House Borehamwood
Client- Kuro Health
The project consisted of dilapidation works to return the site to the landlords previous specification.
The deadline for this project was 4 weeks which we delivered on time.
Project- Coventry Sports Ground
Client- Coventry University
This project consisted of refurbishment and in some areas replacement of two exterior stairways providing access to the various sports facilities.
Project- Engineering & Construction Building
Client- Coventry University
Work consisted of removing existing internal windows and doors and blocking up; changing entrance area set up, M&E works, design and installation of acoustic ceiling baffles and full redecoration.
Project- Dudley Council Office
Client- Dudley Council
The project consisted of a complete refurbishment of an existing meeting room to transform it into a modern collaboration space.
Project- Allison Gingell Building
Client- Coventry University
The project consisted of complete shower room refurbishment, giving it a fresh modern look.
Project- Burgess Hill
Client- Sure-Serve Electrical
The project consisted of dilapidation works to return the site to the landlords previous specification. The turnaround for this job was just 16 days.
PROJECT- Methuen Park
CLIENT- Capita
The project consisted of dilapidation works to return the site to the landlords previous specification.
PROJECT - Valentine Place London
CLIENT - Concentrix
Works consisted of new furniture installation, including lockers and stainless steel noticeboard.
PROJECT - The Courtyard Bolton
CLIENT - Mobile Doctors
Works consisted of strip-out, and full CAT A fit out.
PROJECT - Coventry
CLIENT - Army Careers Centre
Works consisted of overlay of main roof area and redecoration.
PROJECT - Tavistock
CLIENT - Azets
Works consisted of external/internal redecoration,on this grade 2 listed building. We also undertook roofing and rendering repairs along with internal refurbishment.
PROJECT - Trident House-Gately
CLIENT - Concentrix
Works consisted of dilapidation works to return the site to the landlords previous specification.
PROJECT - Gloucester
CLIENT - Azets
Works consisted of site clearance, electrical testing and refurbishment works.
PROJECT - Gladstone House-Crook
CLIENT - Azets
Works consisted of roof refurbishment.
Internal and external redecoration and improvement.
PROJECT - Chester-Le-Street
CLIENT - Azets
Works consisted of dilapidation works to return the site to the landlords original specification.
PROJECT - Q3 ACADEMY - TIPTON
CLIENT - Q3 ACADEMY / ALBANY SPC SERVICES LTD
WORKS -
We were awarded the works following a tender process.
The existing building sited a 25m redundant swimming pool, our brief was to strip out all fixtures and fittings, including the existing ceramic tiles to the base and sides of the pool, we then filled the swimming pool with concrete, working closely with the projec
PROJECT - 60 NEW BROAD ST - LONDON
CLIENT - FINNCAP LTD
WORKS -
We were awarded the works following a tender process.
The works where dilapidation to return the area back to Cat A Landlords spec finishes. Works included strip out of tenant installed Partitions, Flooring, Mechanical & Electrical, and all other Fixtures and Fittings, along with reconfiguring items that had been relocated, and to make
PROJECT - V6 VECTOR PARK - TWICKENHAM
CLIENT - HAYMARKET MEDIA
WORKS -
We where awarded the works following a tender process.
The works were dilapidation to return the office and warehouse area back to Cat A Landlords spec finishes. Works included strip out of tenant installed Car turn tables, Partitions, Flooring, Electrical, and all other Fixtures and Fittings, along with reconfiguring items that
PROJECT - RIVERGATE HOUSE - NEWBURY
CLIENT - CAPITA
WORKS -
We were awarded the works following a tender process.
The works where dilapidation to return the area back to Cat A Landlords spec finishes. Works included strip out of tenant installed Partitions, Flooring, Mechanical & Electrical, and all other Fixtures and Fittings, along with reconfiguring items that had been relocated, and to make good
PROJECT - 92 LONDON ROAD - READING
CLIENT - AZETS
WORKS -
We were awarded the works following a tender process.
The works where dilapidation to return the area back to Cat A Landlords spec finishes. Works included strip out of tenants furniture, Flooring, Mechanical & Electrical, and all other Fixtures and Fittings, along with reconfiguring items that had been relocated, and to make good all disturb
PROJECT - QUORUM BUSINESS PARK - NEWCASTLE
CLIENT - CONCENTRIX
WORKS -
We were awarded the works following a tender process.
The works included the fit out of the existing canteen area, to refresh the space and specify and install new canteen furniture
PROJECT VALUE - £25,000
PROJECT DURATION - 1 WEEK
PROJECT - MANSELL COURT - WIMBLEDON
CLIENT - RAPID ACTION PACKAGING LTD
WORKS -
We were awarded the works following a tender process.
The works were awarded on a D&B basis. We fully designed and carried out a CAT B fit out of the existing carbon neutral floor area. The works included forming breakout areas, new toilet areas, executive glazed offices, AC and heating adjustments,new small power, and f
PROJECT - MIDDLETON - MANCHESTER
CLIENT - CONCENTRIX
WORKS -
We were awarded the works following a tender process.
The works involved the refurbishment of all the existing staff toilet areas. Works included, isolation and strip out off all existing cubicles, sanitaryware, etc. and designing, supplying and installing new vanity units, cubicles, IPS units, sanitaryware, Trovex wall cladding panels, v
PROJECT - ECO BUSINESS PARK - LUDLOW
CLIENT - PREMIER MEDICAL
WORKS -
We were awarded the works following a tender process.
The works involved the refurbishment of the existing Ground and First floor office areas, including the receprtion and toilet areas. Works included installing new kitchen area, Trovex wall cladding panels, decoration throughout, floorcovering, suspended ceiling & LED lighting,